Case study

  • Client C3 Church, Cambridge
  • Location South England
  • Sector Religious buildings
  • Services
    • Architectural & building acoustics design
    • Building services, noise & vibration
    • Environmental noise & planning
C3 Church, Cambridge

In 2016 a new £4.5 million church and community facility was opened in Cambridge.

The venue includes a main worship space for full amplified evangelical music events, and associated café, community hub through the provision of various spaces. Sharps Redmore are providing acoustic services through from early planning to commissioning. The main challenges with the building were the closeness of neighbours, and the control of mechanical plant noise, and breakout noise from the main worship space, all of which were successfully overcome.